
|
Beamline status
- Status beamline optics and filter
bending magnet and extraction mirror : operational
moveable IR windows unit
, Si, Diamond: operational, Quarz and BaF2: in repair (vacuum)
beamline optics to second focal point "F2"
situated beyond shielding wall: operational with residual low frequency vibrations
beamline optics to third focal point: operational
- Status endstations and detectors
Beamline branch A: matching optics between BL and input spectrometer: in construction
high resolution Bomem DA8, MCT and bolometer detectors: operational. BRANCH A NOT OPEN TO OPERATION
Beamline branch B: matching optics between BL and input spectrometer: operational
Bruker 66 ifs/v, DTGS, MCT and bolometer detectors OK: operational
Microfocus with low temperature stage: in test. BRANCH B OPEN TO PILOT/EXPERT USER OPERATION
Beamline branch C: transfer line between BL and input high resolution spectrometer: commissioning
Bruker HR 125, MCT and bolometer detectors: operational BRANCH C OPERATED BY MOLECULAR KINETICS AND SPECTROSCOPY GROUP, M. QUACK, ETH-Z
Beamline branch D, micro-spectrometer: transfer optics between focal point F2 and spectrometer input (KBr window, Diamond on request only) : operational
IR-microscope Hyperion 3000
& Vertex 70 spectrometer with X15, X36, X20 ATR, see S/N: BRANCH D OPEN TO REGULAR USER OPERATION
- Status operation
The micro-spectrometer branch D is in regular user operation
Storage ring status available here
Actual beamline schedule available here
Last modification: January, 6th 2010
|
|